Eekels | TBI Successfully Completes Electrical Installation on the "FWN Adriatic"

We are proud to announce the successful delivery of the FWN Adriatic, the fourth vessel in the innovative Ecobox series built by Ferus Smit Leer for shipping company ForestWave. With a length of 143 meters and a deadweight of 12,500 DWT, this ship is once again impressive in scale.

As with the previous vessels, Eekels | TBI was responsible for the complete electrical package on board. From design to commissioning, our expertise proved valuable across the board. Key components of our scope included:

  • Design, delivery, and commissioning of the 440V 60Hz main and emergency switchboards
  • Installation of the Marpower Automation System and Marpower Drive Cabinet
  • PTO shaft generator for efficient power generation
  • Complete navigation, wing, and GMDSS consoles on the bridge
  • Shore connection of 2x 350A

In addition, we carried out all cabling and installation work, including third-party systems. Eekels also supplied and installed the lighting and fire detection systems, as well as the searchlights.

We are proud to have once again made a high-quality contribution to this vessel and look forward with confidence to the upcoming projects in this successful series.

We wish the crew of the FWN Adriatic a safe and prosperous voyage!

Share this article